Basement Bathroom

This new 6ft x 8ft bathroom is located in the basement level of the home. We use the space to build this bathroom in front of their 6ft closet. We framed in the closet door opening and relocated the entrance at the end of closet to be accessed through the a smaller closet next door.

Scope of Work:

We needed to relocate plumbing by cutting concrete, we moved and added needed electrical, new drywall and painted.  With keeping with the décor and finishes true to the home’s character, we incorporated and used materials that would blend well. The new lighting and lighter paint color really brighten up the space. The homeowners wanted to keep their existing carpet so we pulled it and rolled back out for the remodel. When we were finished we had our flooring contractor come back and cut, stretch and relay the carpet.

By choosing budget friendly in stock products, the homeowners were able to keep the overall costs down on this project and achieve the a much need 2nd bathroom. Products purchased: new shower unit, vinyl plank flooring, vanity and sink top, faucets, toilet, lighting, and accessories i.e. towel bars and toilet paper holder.

Project Completion Time:

6 weeks